Skip to content
Mi Techo Solar

Official call BDNS 930704

INEA grant Andalusia 2026: applications temporarily suspended – waiting list

INEA grant: the Junta has temporarily suspended new applications (23-10-2026). Join the waiting list or ask for a quote without subsidy.

We notify you if the Junta reopens the grants. Meanwhile, we calculate your installation without subsidy (savings and payback).

Waiting-list form: Join the INEA waiting list.

INEA waiting list

Join the waiting list

We notify you if the Junta reopens the grants. Meanwhile, we calculate your installation without subsidy (savings and payback).

Quote without subsidy
1/3

Step 1

Applicant and property

Who would apply for the grant?
Is the property registered for residential use?
Is there any economic activity at the property?

This category is for applicants who do not offer goods or services on the market. A business, office or tourist operation at the property may affect eligibility.

Do you rent out the property, or plan to?

Renting out a home is not treated as economic activity in the rules and is no reason for exclusion. We ask so we can prepare your application properly.

This form does not submit an official application. No reopening date is confirmed and no grant is guaranteed.

Update: the call has been suspended

The budget for the INEA 2026 solar-and-battery grant ran out on 22 de octubre de 2026, hours after the application window opened. The Andalusian Energy Agency suspended the call for the actions whose budget was exhausted, including renewables in private residential homes and buildings, and no new applications are being accepted for this action (BOJA no. 206, 23 de octubre de 2026). See the resolution in the BOJA [F7]

Status

Suspended · budget exhausted

BDNS 930704

€14,902,129.55

Eligible system

Solar PV + battery

Initial check

Rules of the suspended call

Meeting this checklist does not guarantee an award. Eligibility depends on the applicant, the property, the project and the Agency’s decision.

1

The applicant must have no economic activity and fall within an eligible category.

2

The property must be a private home or residential building in Andalucía.

3

Solar PV and battery storage must form part of the same supported investment.

4

The equipment must be new and an energy audit is required before the work is carried out.

5

Battery capacity may not exceed 5 kWh for each kW of generation capacity.

6

Over a year, at least 75% of the energy charged into the battery must come from the associated renewable generation.

7

For subtype 1.3.1, the calculated grant must be at least €6,000.

Required beforehand

Energy audit: from the first measurement to the application

Type 1.3 requires an energy audit issued before the investment is carried out, using the model published by the Agencia Andaluza de la Energía and signed by an energy services provider listed in the IDAE register.[F2]

  1. 1First measurement

    We record actual consumption, available space and the situation of the home or owners’ association in order to size the panels and battery.

  2. 2Prior energy audit

    It must be issued before any work starts, using the Agency’s model and signed by an energy services provider on the IDAE list.[F2]

  3. 3Who may sign it

    The rules require professional independence: whoever carries out the works cannot issue the audit. We tell you which document you need and who can provide it.[F2]

  4. 4Design within the rules

    Panels and battery as one investment, new equipment, a maximum of 5 kWh per kW and a calculated grant of at least €6,000 for subtype 1.3.1.[F2]

  5. 5Online application

    The window opened on 22 October 2026 at 09:00 and was suspended that same day once the budget ran out; a digital certificate in the applicant’s name is required (BOJA no. 206).[F1, F6, F7]

  6. 6After installation

    The execution audit is issued once the works are finished; it contains the post-execution report with the new consumption figures, the energy saved and the CO2 reduction.[F2]

The cost of the prior audit counts among the eligible costs of type 1.3. The award decision and the justification deadlines belong to the Agencia Andaluza de la Energía.[F2]

Local application

Solar panel grants across the Costa del Sol and Andalucía

This INEA call applies across all of Andalucía, so a home or owners’ association in any municipality on the Costa del Sol and in the Guadalhorce valley may fit if the applicant, property and project meet every official condition. Location alone does not guarantee funding or create separate rules: the same INEA conditions apply everywhere.[F1, F2, F3]

Join the waiting list

Grant amount

Historical rates: no funding available for new applications

Increases are not automatic. They depend on official conditions such as specified direct environmental benefits, collective use or location in a demographic-challenge municipality. The percentage applies to eligible costs calculated using official unit-cost modules, not automatically to the full invoice.

€14.9mBDNS record without State aid
€6,000Minimum calculated grant for this subtype
€20,772,507Total in the complete resolution, including other allocations

Process

How we review your situation

1

We collect details about the home or owners’ association.

2

We check whether it appears to fit the official call.

3

We assess solar panels together with battery storage.

4

We identify the technical documents the project needs.

Submission

Official information: new applications suspended

Applications are filed exclusively online with the Agencia Andaluza de la Energía. A recognised digital certificate in the name of the applicant is required.[F1, F6]

Window: opened on 22 October 2026 at 09:00 and suspended that same day once the budget ran out (BOJA no. 206, 23 October 2026).

Open the official electronic portal

Official link recorded in the BDNS 930704 entry for this call.

Our role

Waiting list and quote without subsidy

We check whether your home or owners’ association fits the call before you commission anything.

We design the photovoltaic installation with battery storage as one investment, using new equipment and staying within the 5 kWh per kW limit.

We show you which part of the quote is eligible, calculated with the official unit-cost modules.

We prepare the technical and legalisation documents, which a chartered engineer reviews.

We tell you which documents to attach in the electronic portal and in what order.

We notify you if the Junta reopens this call; no reopening date is confirmed.

The application is filed in the applicant’s name and the grant decision belongs to the Agencia Andaluza de la Energía. Mi Techo Solar reviews your case and prepares the installation and documents, but does not guarantee the award.

Our own experience

700+ installations completed

Officially recognised installer for Deye, Huawei, Solplanet and AIKO. Our team prepares the legalisation documents, which are reviewed by a chartered engineer.

Join the waiting list

INEA 2026 grant · overview

INEA suspended: next steps for your project

New applications are not accepted for the suspended action. Award and justification steps apply to admitted applications; for a new project we assess alternatives without promising a grant.

Application steps

  1. Initial review of your home or owners' association and electricity use.
  2. Panels and battery designed as one single investment (max. 5 kWh per kW).
  3. Prior energy audit, signed by an IDAE-listed provider that does not carry out the works.
  4. Online application: the call was suspended on 22 October 2026 once the budget ran out (BOJA no. 206).
  5. Agency decision (maximum 3 months) and installation.
  6. Execution audit and justification; payment follows once the justification is accepted.

What you need

  • A recognised digital certificate in the applicant's name.
  • New equipment: panels and battery in the same project.
  • At least 75% of the battery's annual charge from your own generation.
  • A prior energy audit, before the installation is carried out.
  • Property details and recent electricity bills.

What Mi Techo Solar offers

  • Consumption review and a quote without deducting an unawarded grant.
  • Design and quote for panels with a battery that meet the requirements.
  • Technical and legalisation documents, reviewed by a chartered engineer.
  • Clear guidance on what to attach and whom to ask for the audit.
  • Installation by our own team, recognised installer of Deye, Huawei, Solplanet and AIKO.

The form records interest and project details; it is not an official grant application. Other support is checked separately. No reopening date is confirmed and no award is guaranteed.

More information on solar grants at subvencionsolar.es

Call suspended

The budget ran out: the call is suspended

We notify you if the Junta reopens the grants. Meanwhile, we calculate your installation without subsidy (savings and payback).

Officially recognised installer of

DeyeHuaweiSolplanetAIKO

Solar panel grant questions for Andalucía

No. The budget for the residential solar-and-battery line ran out on 22 October 2026 and the Andalusian Energy Agency suspended the call, published in the BOJA on 23 October 2026. New applications are not being accepted for this action.

Nationality is not listed here as the deciding condition. The official categories include natural persons without economic activity, but the applicant, residential property and project must satisfy every applicable rule. Ownership of a second home alone does not guarantee eligibility.

Not under the residential solar PV action summarised here. Solar generation and storage must form part of the same supported investment.

New applications are temporarily suspended. Under the rules of the suspended call: yes. The official correction to the rules expressly includes comunidades de propietarios, Spain’s legal form for owners’ associations, in type 1.3, subject to the remaining conditions.

No. The base rate is 55% for applicants without economic activity and 65% is the maximum where official increases apply. The amount is calculated using unit-cost modules and eligible costs, not simply the full invoice.

Yes, if the property is in Andalucía. A home or owners’ association in Málaga, Marbella, Estepona, Coín, Mijas or Fuengirola is within the regional scope, but location alone is not enough: the applicant, property and solar-plus-storage project must meet all official conditions.

New applications are temporarily suspended. Under the rules of the suspended call: yes. The rules do not list renting as a reason for exclusion: the eligible category is natural persons who carry out no economic activity offering goods or services on the market, and renting out a home is not treated as such an activity in the rules. Only if the letting is run as a genuine business (for example, several holiday homes managed commercially) could it be assessed differently. The Andalusian Energy Agency assesses each file; if in doubt, ask us and we will review your situation with you.

We use cookies

We use analytics and advertising cookies to improve your experience and measure our campaign performance. cookie policy.