Official call BDNS 930704
Solar panel grants in Andalucía 2026 for expats and second-home owners
Check the official requirements for this Andalucía solar grant and the basic details of your home or owners’ association. We can review whether your project appears to fit, but the Andalusian Energy Agency makes the final decision.
Free first check
Could your project qualify?
Leave your details. We review your situation and call you back.
22 Oct 2026 · 09:00
€14,902,129.55
Solar PV + battery
Initial check
Main official requirements
Meeting this checklist does not guarantee an award. Eligibility depends on the applicant, the property, the project and the Agency’s decision.
The applicant must have no economic activity and fall within an eligible category.
The property must be a private home or residential building in Andalucía.
Solar PV and battery storage must form part of the same supported investment.
The equipment must be new and an energy audit is required before the work is carried out.
Battery capacity may not exceed 5 kWh for each kW of generation capacity.
Over a year, at least 75% of the energy charged into the battery must come from the associated renewable generation.
For subtype 1.3.1, the calculated grant must be at least €6,000.
Required beforehand
Energy audit: from the first measurement to the application
Type 1.3 requires an energy audit issued before the investment is carried out, using the model published by the Agencia Andaluza de la Energía and signed by an energy services provider listed in the IDAE register.[F2]
- 1First measurement
We record actual consumption, available space and the situation of the home or owners’ association in order to size the panels and battery.
- 2Prior energy audit
It must be issued before any work starts, using the Agency’s model and signed by an energy services provider on the IDAE list.[F2]
- 3Who may sign it
The rules require professional independence: whoever carries out the works cannot issue the audit. We tell you which document you need and who can provide it.[F2]
- 4Design within the rules
Panels and battery as one investment, new equipment, a maximum of 5 kWh per kW and a calculated grant of at least €6,000 for subtype 1.3.1.[F2]
- 5Online application
From 22 October 2026 at 09:00, through the Agency’s electronic portal, with a digital certificate in the applicant’s name.[F1, F6]
- 6After installation
The execution audit is issued once the works are finished; it contains the post-execution report with the new consumption figures, the energy saved and the CO2 reduction.[F2]
The cost of the prior audit counts among the eligible costs of type 1.3. The award decision and the justification deadlines belong to the Agencia Andaluza de la Energía.[F2]
Local application
Solar panel grants in Estepona
Estepona is in Andalucía, so a residential property or owners’ association there may fit this call if the applicant, property and project meet every official condition. Being in Estepona does not guarantee funding or create separate rules: the same INEA conditions apply.[F1, F2, F3]
For system design, indicative prices and a real local installation, see our page about solar panels in Estepona.
Grant amount
55% base rate, up to 65% maximum
Increases are not automatic. They depend on official conditions such as specified direct environmental benefits, collective use or location in a demographic-challenge municipality. The percentage applies to eligible costs calculated using official unit-cost modules, not automatically to the full invoice.
Process
How we review your situation
We collect details about the home or owners’ association.
We check whether it appears to fit the official call.
We assess solar panels together with battery storage.
We identify the technical documents the project needs.
Submission
Where you submit the application
Applications are filed exclusively online with the Agencia Andaluza de la Energía. A recognised digital certificate in the name of the applicant is required.[F1, F6]
Window: from 22 October 2026 at 09:00 until 30 September 2027, or earlier if the budget runs out.
Official link recorded in the BDNS 930704 entry for this call.
Our role
What we do for your application
We check whether your home or owners’ association fits the call before you commission anything.
We design the photovoltaic installation with battery storage as one investment, using new equipment and staying within the 5 kWh per kW limit.
We show you which part of the quote is eligible, calculated with the official unit-cost modules.
We prepare the technical and legalisation documents, which a chartered engineer reviews.
We tell you which documents to attach in the electronic portal and in what order.
We keep you informed of the opening date and any deadline that affects you.
The application is filed in the applicant’s name and the grant decision belongs to the Agencia Andaluza de la Energía. Mi Techo Solar reviews your case and prepares the installation and documents, but does not guarantee the award.
Our own experience
700+ installations completed
Officially recognised installer for Deye, Huawei, Solplanet and AIKO. Our team prepares the legalisation documents, which are reviewed by a chartered engineer.
Solar panel grant questions for Andalucía
Verified documentation
Official sources
Official information checked on 24 September 2026. The official call, rules and any later resolution take precedence over this summary.
